In the final episode of Building a large workshop with only 2 guys, We finally finish our part. A couple things to not is the installation of perforated steel on the upper section of our walls. This will help dramatically reduce echo in the building. We use a black thin plastic to reduce seeing the interior wall thru those perforations...don't worry its not a vapor barrier. Once concrete is poured and doors are installed I will have to come back and show you all the finished building.
Make sure you hit that subscribe button to follow along as we start a pretty epic barndominium next.
Building Plans available here!
https://rrplans.bigcartel.com/Top Tool List
https://imp.i284638.net/orPQmShirts
www.rrbuildings.bigcartel.com
Hearing Protection - ISOtunes
http://bit.ly/2PoXSBw